伸缩门的安装步骤
伸缩门的安装步骤
The installation steps of the telescopic door
伸缩门已经大范围使用到小区、工厂,大家对这种简单易用的电动门比较认可。
Telescopic doors have been widely used in residential areas and factories. We are more familiar with this simple and easy to use electric door.
那么它是如何安装的呢?我们一起来看一下:
So how does it install it? Let's look at it together.
安装方法如下:
The installation method is as follows:
第一步: 确定传达室内控制盒的位置,即操纵伸缩门开关的装置位置;
Step one: determine the location of the indoor control box, that is, the position of the device that controls the telescopic switch.
第二步:将220V电源引到控制盒的位置下端,要求最好是再带1根接地线,粗细规格为1.37,而且有漏电保护装置,并采用PVC暗敷。
The second step: the 220V power source is introduced to the lower end of the control box, and the best is to take 1 ground wire, the size of 1.37, and the leakage protection device, and use the PVC dark compress.
第三步:预留¢ 32mm PVC管道,从控制盒的位置下端往下至地平面以下,穿墙往外,至轨道大致位置地平面下0.1-0.15米处,供以后伸缩门室外线路入室
Third step: keep the 32mm PVC pipe, from the bottom of the control box down to the ground plane, through the wall togaoyaoji.89ix.com gubinlong.89ix.com jiedixiang.89ix.com fenzhixiang.89ix.com fatong.89ix.com baila.89ix.com  the outside, to the 0.1-0.15 meters below the ground plane, for the expansion door outdoor line to enter the room.
第四步:按照上表得出门洞长度,砌门洞时洞宽内净空不小于0.75-0.8米,高度内净尺寸普通门不小于门高+0.25米,豪华门不小于门高+0.1米;门洞末端里侧中上端留宽0.4米,高0.6米检修孔,有条件的可将门洞总长度再加长0.2-0.3米,这样可将检修孔改成一扇小门,方便日后检修维护伸缩门线路。
Fourth step: according to the above table, the length of the hole, the hole width inside the hole width is not less than 0.75-0.8 meters, the height of the net size ordinary door is not less than the gate height +0.25 meters, the luxury door is not less than the gate height +0.1 meters; the upper end of the entrance of the door hole is 0.4 meters wide, 0.6 meters high, the total length of the door can be further lengthened by the length of 0.2-0.3 meters, so that the total length of the door can be further lengthened by 0.2-0.3 meters. A small door will be overhauled by Kong Gaicheng to facilitate maintenance and maintenance of telescopic doors in the future.
第五步:在铺设轨道前除留下约0.8-0.9米宽外,先做好两边的地面;2-3日(冬天5-7日)后,再在铺设轨道的同时,土建配合做好轨道处的地面,注意铺设轨道期间,路面禁止通行。
Fifth step: before laying the track in addition to leaving about 0.8-0.9 meters wide outside, the first side of the ground is done; 2-3 days (winter 5-7 days), and then in the laying of track, civil construction in track of the ground, pay attention to the paved track, the road is forbidden to pass.